Civil engineering stories
Bailey Gair’s election signals a shift in New Zealand’s civil construction sector, as sustainability and climate resilience rise up the agenda.
With 44,000 extra workers needed, New Zealand infrastructure firms are courting schoolgirls to fill trade and technical shortages.
Cyclists and pedestrians can now cross safely after a lightweight steel retrofit won top honours at the SCNZ awards.
Her research on resilience and workforce challenges is set to bolster governance as BRANZ seeks better outcomes for Aotearoa New Zealand's building sector.
New Zealand risks missing its infrastructure build-out unless it creates clearer entry points and training for civil construction workers.
Poor planning for tunnels can leave cities facing congestion, cracking and water ingress that may take years to surface.
Projects saving time, money and emissions were among eight winners at the 2021 IPWEA NZ Asset Management Excellence Awards.
Tree roots can crack walls and disrupt drains when dry soils shrink, making monitoring essential for homes and infrastructure.
Delays and cost pressures are looming for major works as New Zealand struggles to secure key construction materials, a new study finds.
Kiwi architects and builders could gain work as the island's new runway opens direct flights, boosting trade and tourism links.
Projects that kept ferries running, roads safer and power supply secure were among the winners at Civil Contractors New Zealand’s awards in Wellington.
Clients on major construction jobs will gain independent contract oversight as The Building Intelligence Group appoints Charles Brown in Auckland.
The funding will create hundreds of jobs and lift freight reliability as ageing locomotives and wagons are replaced nationwide.
A decade after the quake, engineers say steel buildings proved far tougher than expected, with extra no-damage protection costing little more.
Older spans are under fresh scrutiny as Australasia’s 57,000-plus bridges face heavier traffic, climate stress and overdue maintenance.
Covering 35,000sqm, the wetland is meant to cut pollution, store floodwater and create habitat for endangered native wildlife in South Auckland.
Precision hoses and fittings helped keep the 6-7 tonne AC75 foiling boats upright as the contest was decided by engineering as much as sailing.
NZD $45 billion of new works will need smarter engineering and earlier ground planning if delays and overruns are to be avoided.
Drone surveying and machine control kept workers off a 70% slope, helping the port slip-remediation finish safely and almost exactly to design.
Crowdsourced smartphone data could let road agencies spot pothole risks sooner and prioritise repairs on costly networks more cheaply.